Saturday, April 14, 2012

What a week!

After learning about different glass types and applications for one of the residences (we're currently on site), the client decides to  change all the glass to one type. Lesson of the story "Architecture is a process within a process," (A. VanGraan).
 worked on base drawings, working drawings, changes to schedules and bathroom layouts.

*Sara

Tuesday, April 10, 2012

Chocolate weekend!

I hope everyone enjoyed their long Easter weekend. I did! :)


Feels like I have not posted in a long time...it's only been just over a week.
We have been rather busy in our quaint office. Last week: I went to site, worked on working drawings, details, bathroom layouts, electrical and lighting layouts, a sketch design (being presented today as I...uhm type :) ), I missed a meeting because our drawings were not ready at the printing place in Claremont that's usually on time (but the architect made it) and some admin. 


And today...filing and continuing with bathroom layouts and some printing :) .


*Sara